Farrowstone Pools

How we build

From the first visit to the first swim.

A custom gunite pool usually takes a few months from the design visit to the first swim, most of it in design and permits. Here is every step, so you always know what happens next.

A finished pool in a planted back yard
  1. 01 · Week 1

    Design visit

    We walk the yard with you, talk through how you'll use the pool, and take measurements and photos. Bring your ideas, your photos from magazines, and your questions.

  2. 02 · Weeks 2–3

    Design and fixed price

    You get a drawing of your pool, the materials and finishes we recommend, and a fixed price in writing. We change the design until it's right.

  3. 03 · Weeks 3–6

    Permits

    We prepare the drawings the town needs and handle the permit application. You'll know the start date as soon as the permit is in hand.

  4. 04 · Build week 1

    Excavation and steel

    We mark out the pool, dig, and set the steel that gives the shell its strength. The yard is protected and access is planned with you.

  5. 05 · Build weeks 2–3

    The gunite shell

    The concrete shell is sprayed in one day, then left to cure. Plumbing and electrical go in alongside.

  6. 06 · Build weeks 4–6

    Tile, coping and decking

    Waterline tile, the coping stone around the edge, and the deck. This is where the pool starts to look like the drawing.

  7. 07 · Build weeks 7–8

    The finish and the fill

    The interior finish goes on, the pool is filled, and the water is balanced over the first days.

  8. 08 · Handover

    First swim

    We walk you through the equipment, how to care for the water, and who to call. Then it's yours.